Fast feedback saves the critical Kiln Nose Fan.
SKYLER
The Challenge

- 1New base plate mounted during outage Feb 2025.
- 2Initial vibration levels low, start creeping up soon.
- 39th April 2025 over 1 IPS; report updated to Severe and sent via WhatsApp with recommendation to immediately go and check the bolts and nuts tightness.
- 4Base bolt tightened the same day, Vibration level decrease to below 0.2 IPS.


The Result?
$62,328 in savings for downtime,
motor and base replacements.